Skip to main content.

Northern Lighthouse Board : GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir

  Northern Lighthouse Board is using Delta eSourcing to run this tender exercise

Notice Summary
Title: GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir
Notice type: Competitive Contract Notice
Authority: Northern Lighthouse Board
Nature of contract: Not applicable
Procedure: Not applicable
Short Description: Specification of Requirements Solar Array and A-Frames: Fabricate 6.4m high x 12m x 4m aluminium framework with access ladders leading to A-frames on two working platforms finished with a GRP deck and handrail as detailed on NLB contract drawings. Pedestals: Fabricate two number aluminium pedestals to support the Racon monitoring system and two number aluminium pedestals to support the LED Optics as detailed on NLB contract drawings. General: On completion of the fabrication works, a trial assembly is to be carried out at the suppliers premises to allow the Project Leader and / or his representative the opportunity to inspect individual structural members for acceptability, to check the proposed sequence of erection for safety, and to measure the expected duration of operations on site. Following the trial assembly the supplier should dismantle the structures, then schedule and co-ordinate the delivery and transportation of all components and other commodities to NLB (Oban) Base prior to Friday 15 March 2024. Programme All tenderers must submit a manufacturing and production plan , at tender stage, with a proposed start date during the week commencing Monday 15 January 2024. It is proposed that the fabrication works should take place over a period of 8-10 weeks and delivery of all items within the bill of quantities must be made to NLB’s depot in Oban before Friday 15 March 2024. Tenderers should also advise of any anticipated delays or advancement of the fabrication works programme and incorporate all relevant lead-in times for materials, proprietary items, etc. The tenderers programme shall clearly set out the sequence of fabrication and proposed time limit within each operation giving the dates of commencement and completion. The tenderer in preparation of this programme shall take cognisance of work by sub-contractors, and availability of materials, transportation and all other matters related to the works. On agreement or negotiation of the programme by the Project Leader, the tenderer will be responsible for the execution of the work in conformity therewith. Submission of the programme will not relieve the tenderer of his responsibility to apply in writing for instructions, drawings etc. in accordance with the agreed contract terms and conditions. The tenderer shall record progress on a copy of the programme kept on his premises. The tenderer must also update or redraft the programme without delay if any circumstances arise, which affect the progress of the works and submit copies of all revisions to the Project Leader immediately. For a more detailed description please refer to the Tender Document.
Published: 21/11/2023 14:29
Please note that the deadline for response to this opportunity has passed. However, you can still register or log-into the Delta eSourcing solution to prepare your Supplier Profile for future opportunities.

View Full Notice

Competitive Contract Notice

1. Title: GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir
2. Awarding Authority:
    Northern Lighthouse Board
    84 George Street, Edinburgh, EH2 3DA, United Kingdom
    Tel. 07785 707856, Email: Procurement@nlb.org.uk, URL: https://www.nlb.org.uk/
    Contact: Ruth Millan, Attn: Ruth Millan
3. Contract Type: Supplies
      Sub Type: PURCHASE

4. Description: Fabrication work. Specification of Requirements

Solar Array and A-Frames:
Fabricate 6.4m high x 12m x 4m aluminium framework with access ladders leading to A-frames on two working platforms finished with a GRP deck and handrail as detailed on NLB contract drawings.

Pedestals:
Fabricate two number aluminium pedestals to support the Racon monitoring system and two number aluminium pedestals to support the LED Optics as detailed on NLB contract drawings.

General:
On completion of the fabrication works, a trial assembly is to be carried out at the suppliers premises to allow the Project Leader and / or his representative the opportunity to inspect individual structural members for acceptability, to check the proposed sequence of erection for safety, and to measure the expected duration of operations on site.

Following the trial assembly the supplier should dismantle the structures, then schedule and co-ordinate the delivery and transportation of all components and other commodities to NLB (Oban) Base prior to Friday 15 March 2024.

Programme
All tenderers must submit a manufacturing and production plan , at tender stage, with a proposed start date during the week commencing Monday 15 January 2024. It is proposed that the fabrication works should take place over a period of 8-10 weeks and delivery of all items within the bill of quantities must be made to NLB’s depot in Oban before Friday 15 March 2024.

Tenderers should also advise of any anticipated delays or advancement of the fabrication works programme and incorporate all relevant lead-in times for materials, proprietary items, etc.

The tenderers programme shall clearly set out the sequence of fabrication and proposed time limit within each operation giving the dates of commencement and completion. The tenderer in preparation of this programme shall take cognisance of work by sub-contractors, and availability of materials, transportation and all other matters related to the works. On agreement or negotiation of the programme by the Project Leader, the tenderer will be responsible for the execution of the work in conformity therewith.

Submission of the programme will not relieve the tenderer of his responsibility to apply in writing for instructions, drawings etc. in accordance with the agreed contract terms and conditions. The tenderer shall record progress on a copy of the programme kept on his premises. The tenderer must also update or redraft the programme without delay if any circumstances arise, which affect the progress of the works and submit copies of all revisions to the Project Leader immediately.

For a more detailed description please refer to the Tender Document.
5. CPV Codes:
   45255400 - Fabrication work.

6. NUTS Codes :
   UKM - SCOTLAND

7. Main Site or Location of Works, Main Place of Delivery or Main Place of Performance: SCOTLAND,
8. Reference Attributed by the Awarding Authority: ENPR/LHYS/2278
9. Estimated Value of Requirement: Category H: 100K to 500K
Currency: GBP
10. Deadline for Expression of Interest: 19/12/2023 14:00:00
11. Address to which they must be sent:
   Not Provided
   
12. Other Information:
Other Information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://nlb.delta-esourcing.com/tenders/UK-GB-Edinburgh:-Fabrication-of-Solar-Array%2C-A-Frames-and-Pedestals---Hyskeir/75V8858U9V

To respond to this opportunity, please click here:
https://nlb.delta-esourcing.com/respond/75V8858U9V
TKR-20231121-PRO-24533049
Suitable for VCO: No
Procedure Type:OPEN
Period of Work Start date: 15/01/2024
Period of Work End date: 15/03/2024
Is this a Framework Agreement?: no

View any Notice Addenda

View Award Notice

Competitive Contract Award Notice

Associated Parent Notice
CompetitiveContractNotice - GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir
1. Title: GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir
2. Awarding Authority:
    Northern Lighthouse Board
    84 George Street, Edinburgh, EH2 3DA, United Kingdom
    Tel. 07785 707856, Email: Procurement@nlb.org.uk, URL: https://www.nlb.org.uk/
    Contact: Ruth Millan, Attn: Ruth Millan
3. Contract Type: Supplies
      Sub Type: PURCHASE

4. Description: Fabrication work. Specification of Requirements

Solar Array and A-Frames:
Fabricate 6.4m high x 12m x 4m aluminium framework with access ladders leading to A-frames on two working platforms finished with a GRP deck and handrail as detailed on NLB contract drawings.

Pedestals:
Fabricate two number aluminium pedestals to support the Racon monitoring system and two number aluminium pedestals to support the LED Optics as detailed on NLB contract drawings.

General:
On completion of the fabrication works, a trial assembly is to be carried out at the suppliers premises to allow the Project Leader and / or his representative the opportunity to inspect individual structural members for acceptability, to check the proposed sequence of erection for safety, and to measure the expected duration of operations on site.

Following the trial assembly the supplier should dismantle the structures, then schedule and co-ordinate the delivery and transportation of all components and other commodities to NLB (Oban) Base prior to Friday 15 March 2024.

Programme
All tenderers must submit a manufacturing and production plan , at tender stage, with a proposed start date during the week commencing Monday 15 January 2024. It is proposed that the fabrication works should take place over a period of 8-10 weeks and delivery of all items within the bill of quantities must be made to NLB’s depot in Oban before Friday 15 March 2024.

Tenderers should also advise of any anticipated delays or advancement of the fabrication works programme and incorporate all relevant lead-in times for materials, proprietary items, etc.

The tenderers programme shall clearly set out the sequence of fabrication and proposed time limit within each operation giving the dates of commencement and completion. The tenderer in preparation of this programme shall take cognisance of work by sub-contractors, and availability of materials, transportation and all other matters related to the works. On agreement or negotiation of the programme by the Project Leader, the tenderer will be responsible for the execution of the work in conformity therewith.

Submission of the programme will not relieve the tenderer of his responsibility to apply in writing for instructions, drawings etc. in accordance with the agreed contract terms and conditions. The tenderer shall record progress on a copy of the programme kept on his premises. The tenderer must also update or redraft the programme without delay if any circumstances arise, which affect the progress of the works and submit copies of all revisions to the Project Leader immediately.

For a more detailed description please refer to the Tender Document.
5. CPV Codes:
   45255400 - Fabrication work.

6. NUTS Codes :
   UKM - SCOTLAND

7. Main Site or Location of Works, Main Place of Delivery or Main Place of Performance: SCOTLAND,
8. Reference Attributed by the Awarding Authority: ENPR/LHYS/2278
9. Awarded to:

    JGC Engineering and Technical Services Ltd
    JGC House, Janetstown, Thurso, Caithness, KW14 7XF, United Kingdom
    Tel. 01847 896767
    Attn: Robbie Campbell
Value Cost: 137,728.25
Is Awardee likely to subcontract?: No Awarded to SME?: Yes
10. Date of Contract Award: 15/01/2024
11. Number of Tenders Received: 4
12. Other Information:
Other Information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
To view this notice, please click here:
https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=835785070
TKR-2024116-PRO-24971480
Suitable for VCO: Yes
Procedure Type:OPEN
Period of Work Start date: 16/01/2024
Period of Work End date: 15/03/2024