Northern Lighthouse Board : Generator Connection Point

  Northern Lighthouse Board has published this notice through Delta eSourcing

Notice Summary
Title: Generator Connection Point
Notice type: UK6: Contract award notice
Authority: Northern Lighthouse Board
Nature of contract: Works
Procedure: Below threshold - Open competition
Short Description: NLB Oban Base – Generator Connection Point NLB require the facility to manually connect a standby diesel generator to provide temporary power to the NLB Oban base electrical system in the event of a mains failure or a blackout. This will take the form of a generator connection point on the outside wall of the ESTF Building with cabling routed on tray to the Switchboard in the ESTF Switch room. The cabling from the new Generator Connection Point will be connected to an existing spare breaker in Compartment A2 in the LV Switchboard. The existing 400A Breaker in compartment A2 is required to be configured such that the load side feeds the switchboard busbar. This has been discussed with Terasaki and basically entails a rotation of the breaker ‘in situ’ as highlighted in photograph below. This is because the existing breaker protection device is not bi-directional. Site Visit A site visit is planned for Thursday 4 December 2025. This is a mandatory requirement and any supplier not attending the site visit will be excluded from this quotation exercise.
Published: 14/01/2026 16:34

View Full Notice

UK-Edinburgh: Electrical installation work.


Scope


Description: NLB Oban Base – Generator Connection Point

NLB require the facility to manually connect a standby diesel generator to provide temporary power to the NLB Oban base electrical system in the event of a mains failure or a blackout.

This will take the form of a generator connection point on the outside wall of the ESTF Building with cabling routed on tray to the Switchboard in the ESTF Switch room.

The cabling from the new Generator Connection Point will be connected to an existing spare breaker in Compartment A2 in the LV Switchboard.

The existing 400A Breaker in compartment A2 is required to be configured such that the load side feeds the switchboard busbar. This has been discussed with Terasaki and basically entails a rotation of the breaker ‘in situ’ as highlighted in photograph below. This is because the existing breaker protection device is not bi-directional.

Site Visit
A site visit is planned for Thursday 4 December 2025. This is a mandatory requirement and any supplier not attending the site visit will be excluded from this quotation exercise.
To view this notice, please click here:
https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=1006519757

To respond to this opportunity, please click here:
https://nlb.delta-esourcing.com/respond/K32PX9ED7D

Total value (estimated):


GBP 35,000 excluding VAT GBP 42,000 including VAT





Contract Details



Contract 1



Contract value: GBP 52,251.61 including VAT



Below the relevant threshold: Yes



Award decision date: 12/01/2026



Earliest date the contract will be signed: 14/01/2026



Contract dates (estimated): 19/01/2026 to 30/01/2026



Main procurement category: WORKS



CPV classifications:
45310000 - Electrical installation work.

45311100 - Electrical wiring work.







Supplier




Supplier: Sulzer Services UK Limited



Castle Street

Ellon

AB41 9RF

UK


Email: info@sulzer.com



Small or medium-sized enterprise (SME): No





Contract: 1




Procedure


Procedure type: Below threshold - open competition

Contracting Authorities


View any Notice Addenda

View Award Notice